I'm working on a wee side project for the game and need a bit help.
From the FAQ the Station Cost Formula should be
100000+(200000×log2×(total station-22))
I have tried this formula out and getting nowhere near what the cost is or should be.
Now either I'm doing something wrong (most likely) or the formula is slightly off.
I'm wanting to break the formula down too so I can easily apply it to small and large stations.
I have tried to get it to work in Google Sheets as that's what I'm using for this side project so if someone could help or advise it would be great.